Skip to main content
NOTACHEMSHANGHAI · CHINA

Get the information first, decide later

Many sourcing decisions stall simply because documents cannot be obtained. So the common ones are laid out here: files where we can give files, process where something must be signed, and a direct technical answer where the question is not on the list.

Documents

Choose by purpose

Different departments need different documents. Asking for the wrong one costs a round trip, so they are grouped by purpose.

COA

Existing orders and purchased lots, for goods-in and release.

Quality / warehouse

1 business day

SDS

EHS registration, transport declarations, lab safety.

EHS / logistics

1 business day

Product specification

Supplier qualification, benchmarking, technical comparison.

Purchasing / technical

1–2 business days

Methods and validation report

Method transfer, laboratory verification, in-house specification setting.

Analytical / quality

3–5 business days

Process description summary

Supplier audits and process understanding.

Technical / audit

NDA required

Impurity standards and spectra

Method development, impurity assignment, structure comparison.

Analytical / R&D

3–6 weeks by product

Third-party testing report

Re-testing at a client-nominated laboratory, charged per project.

Quality

Per laboratory schedule

01

State the purpose

Tell us what the document is for — goods-in, laboratory verification, audit or internal evaluation — and for which product, so the right version is sent.

02

Verify identity

Company email or a stamped request letter; process-related documents require an NDA.

03

Receive the file

Standard documents within one business day; compiled material with a stated delivery date.

Client-specific custom products and third-party confidential information are outside the scope of what we can release.

Request documents

FAQ

The twelve questions we are asked most

If yours is not here, ask — we will add the answer.

Ordering & delivery

What is the minimum order quantity?

Catalogue products from 5 g; routine custom synthesis from 10 g. Scale-up and commercial batches usually start at kilogram scale, assessed per molecule and process.

Can I get a sample first?

Yes. Catalogue items are sampled from 5 g at standard price; custom molecules are sampled once the route works, and the sample charge is credited against the order.

What are typical lead times?

Stock items ship in 3–5 working days. Made-to-order items are scheduled, typically 3–6 weeks per batch. Custom synthesis is quoted at 2–12 weeks depending on route complexity.

What pack sizes do you use?

5 g / 25 g / 100 g / 500 g / 1 kg bottles as standard, 25 kg fibre drums in bulk, or client-specific packaging. Dangerous goods follow UN packaging requirements.

What payment terms are available?

Bank transfer as standard, with credit terms for established customers. Export orders by T/T. Terms are set out in the contract or proforma invoice.

Technical & documents

How is purity measured?

HPLC area normalisation by default, with chiral HPLC for ee on chiral compounds. External-standard assay or residual solvent data is specified in the contract where required.

Can you provide structural confirmation spectra?

Yes. HPLC, LC-MS and 1H NMR are standard; 13C NMR, 2D spectra or elemental analysis are arranged per project.

How do I distinguish salts with the same CAS number?

Product pages list formula and molecular weight; salts and free bases are separate catalogue entries with separate codes. Confirm by product code rather than CAS alone.

Can you test against our own specification?

Yes. Send your specification and methods; we confirm whether they can be met and carry out method transfer and validation where needed.

Confidentiality & compliance

How long does an NDA take?

One to two business days on our template; three to five on yours if legal review is needed. Before signing, a molecular weight range can be shared instead of the full structure.

Will you sell our molecule to someone else?

No. Client-specific molecules and processes do not enter the catalogue and are not offered to other customers. This is contractual, not a verbal assurance.

Do you accept on-site audits?

Yes. Two weeks’ notice gives access to production areas, batch records, retention samples and raw data. Sharing the checklist in advance lets the right people be present.

Technical notes

Three notes for buyers and technical teams

Written for technical and purchasing staff approaching an intermediate supplier for the first time — how to read the documents, what matters beyond purity, and why scale-up fails.

01 · Technical note

How to read an intermediate COA

The line most often skipped is the test basis. Two COAs both reading "purity 99%" can mean different things: area normalisation carries no correction factor, while external-standard assay reflects true content. The two are not comparable.

Next, how related substances are expressed. "Largest single impurity ≤0.5%" and "total impurities ≤1.0%" are different control strategies: the first tracks a known individual impurity, the second a sum. For a regulatory filing you usually need to know the identity of each specified impurity, not just a total.

Then residual solvents. ICH Q3C separates Class 1 (to be avoided), Class 2 (to be limited) and Class 3 (low toxicity). A report should state which solvents were tested and on what basis. "Conforms" with no solvent names and no numbers carries almost no information.

Finally, check that lot numbers and dates match the physical goods. Intermediates are not registered, but once they enter an API supply chain, lot traceability is the first door an auditor opens.

02 · Technical note

Intermediate quality control is not about the purity number

Buyers focus on the first decimal of purity, but three other things determine what happens downstream: the impurity profile, the polymorph and the particle size.

The impurity profile decides whether downstream purification can fix a problem. An intermediate at 98% with identified impurities is often more usable than one at 99.5% with unknown impurities, because you can judge which will be purged in the next step and which will carry through to the final product.

Polymorph and particle size decide filtration, drying and flow. Material of identical chemical purity but too fine a particle size can double centrifuge time and drying time, and later appear at the formulation end as blend uniformity problems. None of this is visible on a standard COA; particle size distribution must be requested separately.

So the question is not "how pure is it" but "do they know what the impurities are, is it consistent batch to batch, and can they trace back when something goes wrong".

03 · Technical note

Scale-up is not multiplying the charge

A reaction that runs in one litre often loses ten points of yield at a thousand. The cause is usually physical rather than chemical: heat-transfer area falls relative to volume as size grows, so the same jacket temperature heats the mass several times more slowly. Agitator shear is highest at the tip and lowest near the wall, and concentration gradients widen with scale.

The first thing to fail is usually an exothermic step. Heat that a lab ice bath absorbs without effort needs, at ton scale, a calculation of heat release rate against cooling capacity. That is why reaction calorimetry is not optional in a scale-up assessment: it sets the ceiling on addition rate, and addition rate sets batch time.

Second is the relationship between addition time and mixing time. In a small vessel a thirty-minute addition mixes as it goes. In a large one the same thirty minutes may end before mixing does, and local excess turns straight into by-products. A workable rule is to keep addition time at five to ten times the mixing time, with the multiple set by how concentration-sensitive the reaction is.

Third is workup: phase separation and filtration. Emulsions, slow settling and wet cakes that take ten minutes in a litre separatory funnel can take eight hours in a thousand-litre vessel. A filtration and centrifugation trial on a small portion before scale-up is far cheaper than adding filter aid afterwards.

This is why we step up rather than jump: 5 L to 50 L exposes different problems than 500 L to 5,000 L, and each step buys information at very low cost.

Not finding what you need?

Just ask. Technical questions are answered by the technical team rather than relayed through sales — and if we cannot answer, we say why.

Resources · Document requests, FAQ and technical notes | NOTACHEM